This £22m replacement school for Ysgol Cedewain includes purpose built state-of-the-art facilities including a hydrotherapy pool, sensory and physiotherapy rooms.
Boclair Academy, East Dunbartonshire, Glasgow
This mulit-phased project involed the construction of a two storey building on a live school site, within a residential area
Schools & Further Education - Scotland
- Home
- Our Experience
- Boclair Academy, East Dunbartonshire, Glasgow
Project Overview
The new Boclair Academy involves the provision of a new two-storey school building within the grounds of the existing school on Inveroran Drive in Bearsden, Glasgow. This provides state-of-the-art facilities for 1,050 pupils, comprising a large entrance atrium, flexible teaching zones, performance spaces and dining areas. This new secondary school aligns with Scot Gov LEIP policies. Procured through Scape, The Concept Design phase concentrated heavily on the location of the new school with primary attention given to not compromising existing escape routes, providing safe pedestrian access and minimising school operations during the construction phase. This helped with the coordination of a live school environment during construction. Dealing with surface water drainage and connection to foul drainage at the higher level created a series of engineering challenges.
Key Points:
Live school environment within a residential area
Multi-phased project
Constrained site
Finished ahead of time
Images copyright David Cadzow
The Challenge
The project provides a series of challenges including the site topography where the design has incorporated a 4m level change across the footprint of the school.
Our Solution
This has offered the Design Team the opportunity to introduce a number of dynamic and exciting circulation spaces within the central part of the school, which benefit from a profusion of natural light into the core of the building.